ARQ Blog Freelancer tips
Operations Process Chart: Symbols and a Worked Example
Santiago Sanchez
Santiago Sanchez ·

An operations process chart shows, in order, only the operations (circle) and inspections (square) of a process, with their time. Unlike a flow process chart, it leaves out transport, delays and storage.

The operations process chart comes from industrial engineering. It shows at a glance which steps transform a piece of work and where it gets checked, using only two symbols.

Here is what it is, how it differs from other process diagrams, and a worked freelance example you can copy.

Operations Process Chart: What It Is, Symbols and Example

What is an operations process chart?

It is a chart that shows the sequence of the main operations and inspections in a process, without saying where or by whom they are done. It is the first step in studying a process: the overview before going into detail.

It is not the same as a flowchart, which uses diamonds for decisions, or a flow process chart, which adds transport, delays and storage with their times and distances.

The symbols

Process chart symbols come from the American Society of Mechanical Engineers (ASME) standard. The operations process chart uses only the first two:

Symbol

What it represents

In the operations chart?

Circle: operation

An action that changes the product or work: writing, designing, coding, packing

Yes

Square: inspection

A check that changes nothing: quality, quantity or whether it meets the brief

Yes

Circle inside a square

Operation and inspection at the same time

Yes

Arrow: transport

Moving something from one place to another

No, only in the flow process chart

D: delay

Work stops while it waits for the next action

No

Inverted triangle: storage

Something is kept until it is used

No

How to make an operations process chart

  1. Define the process and its limits: where it starts and ends, for example from the client approving the proposal to receiving the final file.

  2. Write the operations and inspections in order, top to bottom, on a vertical line.

  3. Number each symbol by type: O-1, O-2… for operations and I-1, I-2… for inspections.

  4. Note what each step is and how long it takes on the right.

  5. If a new material or input comes in, draw it as a horizontal line joining the main line at the step where it is used.

  6. Add a summary at the end: number of operations and inspections and total time.

This is a freelance designer’s process from the client approving the proposal to delivery. Copy the table and replace the steps and times with yours.

Code

Symbol

Step

Time

O-1

Circle

Read the brief and gather references

1 h

O-2

Circle

Sketch three options

4 h

I-1

Square

Client reviews and picks one

30 min

O-3

Circle

Digitize and apply changes

3 h

I-2

Square

Check colors, typography and sizes against the brief

30 min

O-4

Circle

Export final files (vector, PNG, PDF)

45 min

I-3

Square

Client approves the final version

30 min

O-5

Circle

Send the files and the invoice

15 min

Summary: 5 operations (9 h) and 3 inspections (1 h 30 min), 10 h 30 min in total. Two of the three inspections depend on the client: if they are late, the project stops, so it pays to set a response time in your proposal.

What it is useful for

  • Standardizing a service you repeat: the same chart works as a checklist for every client.

  • Pricing better: if you know the total hours, you know what to charge.

  • Spotting lost time: if an inspection keeps repeating, a step may be missing before it.

  • Showing clients how you work and when you need their answer.

You can draw it on paper, in a spreadsheet or in diagram tools such as Microsoft Visio or Lucidchart. To find the cause of a problem, try an Ishikawa diagram.

If you bill clients abroad, ARQ gives you your own account details in the U.S. and Europe to receive payments in USDs and EURc. On the Standard plan, each international payment costs US$3 or €3.

Sources:

Your bank would hate
if you saw our rates.

Get digital dollars and digital euros in seconds, at real market rates. Without hidden fees.